We have our first few days into the 50'sF, so back to work. We're heading towards the first small bridge. |
Child labor laws are no obstacle on this railway as my railway gang removes ties from an old panel so they can be reused. The rail needs to be bent for these curves so the ties must be removed first. |
We make it to the first bridge going over a small stream. About 150 ft of rail down now, 80 to go. |
Motive Power! I've got a Maxitrak chasis kit from the UK put together and upgraded the motor controller to the 4QD VTX with hand controller. |
Attached it to my home made flat car. Trucks (the wheels and axels) are from One Inch Scale Railroad Supply. |
Coupler is a home made one with spare parts from the local big box store conecting to the Maxitrak chasis connector. |
No comments:
Post a Comment