Finished the line yesterday morning! Completed the last 13 feet of track and then added balast around the line to even it up a bit. A gold painted screw was ceramoniously placed and the line was opened. After a quick adjusted of some rail on the big bridge I was able to go around multiple times without a derailment. My daughter then became engineer and she made multiple loops without a problem. Still some areas with too steep a gradient, will need to fine tune with more ballast to minimize these so I can haul more cars and people. The following photos show the line as you would travel it.
It was alot of work but I am pleased with the result.
No comments:
Post a Comment